The Plumbing and Heating Department was established soon after the formation
of the Company nearly 30 years ago.
The present manager - Phil Passmore - has been leading this section from the
early eighties. He is also a Company Director.
Above ground drainage - guttering and leadwork are all the responsibility of
this department.
The Electrical Department in its present form was established in the late
nineties.
The present manager - Mick Boddy built up the department to achieve full
certification within 3 years of its formation.
PAT testing is also carried out by this department.
Click here for full details of certifications
and affiliation
. |
|
| |
Work
carried out by these two Departments covers both the domestic and commercial
areas.
The Departments are sub-contractors to the firm's building section and also
do sub-contract work for local building
contractors who do not have
their own dedicated departments. Below are some examples of their
work.
Click here for further details under 'Divisions' |
|
| |
 |
COMMERCIAL
CONTRACTS |
 |
|
| |
|
|
|
|
| |
 |
 |
 |
|
| |
|
|
|
|
| |
 |
 |
ABOVE LEFT
Boiler Room at Gresham Sports
Pavilion
West Bridgford, Nottingham
ABOVE RIGHT
Electrical Switch gear
Gresham Sports Pavilion,
West Bridgford,
Nottingham
LEFT
Boiler Room at West Park Pavilion,
West Bridgford, Nottingham
|
|
| |
|
|
|
|
| |
 |
 |
 |
 |
|
| |
Concealed Lighting Installation
at St Mary's Church, Car Colston, Notts |
Switchgear and wind turbine installation
at Colwick Park Adventure Centre by the River Trent |
Portable Appliance
and Circuit
Testing |
CCTV and Fire alarm
installations |
|
| |
|
|
|
|
| |
 |
 |
 |
|
| |
Trent Valley School
Toilet refurbishment |
Blidworth Leisure Centre, near Newark
Refurbishment of showers and toilets |
Afro Caribbean Centre - Nottingham
Upgrade of toilets/washrooms and water service renewal |
|
| |
|
|
|
|
| |
Registered Corgi Gas Installer |
DOMESTIC
CONTRACTS |
NICEIC Part P Domestic
Registered Installer |
|
| |
 |
  |
 |
|
| |
Central heating installation
Combi installation and replacement |
Disabled adaptations -
Downstairs bathrooms & easy access showers |
Upgrading of domestic electrical services
-
Rewiring, new consumer units, earth upgrades |
|
| |
|
|
|
|
| |
 |
 |
 |
|
| |
Refurbishment to form a shower room
New low level entry shower |
Typical bathroom refurbishment -
Including new
tiling, heating & accessories |
Replacing radiators - Central heating
upgrade
Modern and efficient designs with thermostatic control |
|
| |
|
|
|
|
| |
 |
 |
 |
|
| |
|
|
|
|